The contractor who did a beautiful kitchen in a 1990s colonial down the street may be exactly the wrong person for a 1910 stone twin. Old houses are built differently, they fail differently, and the fixes that work on newer construction (cement mortar, vinyl wrap, spray foam, a dumpster for everything that looks tired) often make an old house worse. Hiring well for a historic renovation comes down to three things: finding someone whose instinct is to repair before replacing, making sure the paperwork Pennsylvania requires is actually in place, and writing a scope tight enough that two bids can be compared honestly.
Restoration contractor or remodeler
Most general contractors are remodelers, and there is nothing wrong with that. Their business is built around new materials, standard sizes, and predictable schedules. A restoration contractor works from the opposite direction. The starting question is what is already there, why it failed, and whether it can be saved.
The difference usually shows up in the first walkthrough. A restoration contractor will ask how old the house is, poke at window sills and porch boards, look at the mortar joints, and want to know where water goes when it rains. A remodeler is more likely to start talking about what the finished room will look like. Both conversations have their place. On an old house, the first one has to happen before the second one means anything.
Some other signs worth paying attention to:
- Photos of past work on houses of a similar age, ideally with before and after shots of repairs rather than only finished rooms.
- References from owners of older houses, not just recent subdivisions.
- Comfort talking about lime mortar, old growth wood, plaster, and lead paint without changing the subject.
- A willingness to say a part should be repaired even when replacing it would be a bigger job.
One general contractor, or hiring the trades directly
A general contractor coordinates everything: scheduling, permits, subcontractors, and the order of work. On a large renovation that touches structure, systems, and finishes all at once, that coordination is worth paying for. The catch on an old house is that the general contractor is only as good as the subs they bring in. A careful GC who hands the chimney to a mason who repoints with hard Portland cement has still damaged the chimney.
Asking who will actually do each piece of work, and whether those people have done it on old buildings before, is a fair question. Some owners split the job: a general contractor for the core renovation, with specialist trades hired directly for the parts that need old house skills, like slate, plaster, masonry, or window restoration. That means more coordination work for the owner, and it needs to be settled up front so nobody is surprised about who is responsible for what.
Specialist trades are thinner on the ground than general remodelers. Most of the restoration firms in this directory are based outside Delaware County and travel in for work, which can affect scheduling and pricing. Good ones are often booked months ahead.
What Pennsylvania requires
Pennsylvania's Home Improvement Consumer Protection Act sets the ground rules for most residential renovation work, and it gives homeowners more protection than many people realize. According to the Office of Attorney General, contractors who do $5,000 or more in home improvement work a year must register with that office, and the registration number (it starts with "PA") has to appear on their contracts, estimates, proposals, and advertisements. Registration can be checked on the Attorney General's website or by phone before anything is signed.
Registration is worth checking, but it is not the same as a license. It is a consumer protection listing. The application asks about identity, business history, past legal trouble, and insurance, but the law describes no skills test or review of workmanship, so a registered contractor is not necessarily a qualified one, and it says nothing about experience with old buildings.
The same law covers the contract itself. Under the Attorney General's guidance, any home improvement contract over $500 must be in writing, and a homeowner can cancel it without penalty within three business days of signing, except in emergencies. The Act itself spells out more of what a valid contract has to contain:
- The contractor's registration number, name, street address, and phone number, plus approximate start and completion dates.
- A description of the work, materials, and specifications, which can only change through a written change order signed by both sides.
- The total price, with the down payment and any special order materials listed separately, and the names of subcontractors already known.
- A notice of the homeowner's right to cancel.
- On contracts over $5,000, the deposit cannot exceed one third of the price, plus the cost of special order materials named in the contract.
- Proof of liability insurance, with minimums of $50,000 for personal injury and $50,000 for property damage.
A contractor who wants cash before the contract is signed, or a large deposit for ordinary stock materials, is a reason to slow down. The law says no payment can be demanded before the contract is signed.
Lead paint is part of the job
Almost every house built before 1978 has lead paint somewhere, and in a house from the 1920s or earlier it is close to a certainty on trim, windows, doors, and porches. Federal rules require contractors who disturb painted surfaces in pre-1978 homes, above small minimum areas, to be certified firms using lead-safe work practices. On a renovation that involves opening walls, pulling trim, or replacing windows, that applies to nearly everyone on site. Asking for the firm's EPA certification is a reasonable first-call question. The guide on lead paint and repainting goes into what those rules look like in practice.
Permits and historic districts
Building permits in Delaware County are handled by each township or borough, not the county, and the rules on what needs one vary from place to place. Whoever pulls the permit is generally the one the municipality holds responsible for the work, so it matters whose name goes on it. If a contractor suggests skipping a permit on structural, electrical, or plumbing work, that suggestion tends to come back up when the house is sold.
Houses inside a local historic district add another layer. Exterior changes visible from the street, like windows, porches, siding, and roofing, may need approval from a historic review board before the building permit is issued, and that review can add weeks. A contractor who has worked in that municipality before will usually know how it goes. The guide on historic district rules explains how to find out whether an address is covered.
Writing a scope that produces comparable bids
Three bids that come in at wildly different numbers are usually three different jobs. One includes repairing the plaster after the electrician is done and the other does not. One assumes the window sashes will be restored and another prices replacement. The fix is a written scope sent to every bidder before anyone gives a number: what is being done, room by room, with notes on what should be repaired rather than replaced.
Old houses hide things, and an honest bid admits it. Rotted framing behind a bathroom wall, knob and tube wiring nobody knew about, a sill beam that turns to powder when the siding comes off. Good bids handle the unknowns in one of a few ways: a stated contingency, unit prices for common surprises (per foot of joist sistered, per square foot of plaster repaired), or a time and materials portion for the opening up phase with a fixed price after the walls are open. A bid that claims to have no unknowns on a century old house is either very experienced or not being straight.
Allowances deserve a close read too. An allowance is a placeholder amount for something not yet chosen, like tile or light fixtures. If the allowance is unrealistically low, the bid looks cheaper than the job will be.
Sequence matters on an old house
The order of work on a historic renovation is not just a scheduling question. Water is the root cause of most old house damage, so the roof, gutters, flashing, and drainage around the foundation come before interior finishes. Structure comes next, then systems like wiring, plumbing, and heating, and only then plaster, paint, and trim. Spending money on a finished kitchen under a leaking slate roof is a common and expensive mistake. The guides on slate roofs and fieldstone foundation moisture cover two of the places water usually gets in.
Payment and paperwork during the job
Payments tied to finished stages of work (framing done, rough-in inspection passed, plaster complete) are easier to manage than payments tied to calendar dates. Holding the final payment until the punch list is done and the final inspection has passed is common practice. Keeping copies of every change order, along with photos of what was found when the walls came open, also builds a useful record for the next owner of the house.
Questions to ask before hiring
- What is your Pennsylvania home improvement registration number?
- Is your firm EPA lead-safe certified, and who on the crew holds the certification?
- Can you show work on houses built before 1940, and can I talk to those owners?
- Which parts of this job will your own crew do, and which will be subcontracted? To whom?
- What do you expect to find once the walls or floors are open, and how is that priced?
- Who is pulling the permits, and have you worked with this township or borough before?
- If the house is in a historic district, have you been through that review board?
- Can I see a certificate of insurance?
The answers matter less than how they are given. A contractor who is comfortable with old houses tends to answer these quickly and with specifics, and usually has a few stories about what turned up behind the plaster on the last job.